01.1999
Procedure
1. Switch over from the physical structure to the localization structure
Function Loc. Commissioning
2. Using the commissioning list, select the ’DC1136o’ output section from a DC1136
output module in the localization structure and the corresponding ’output element
with confirmation’ (’EL out 2’) in the logical structure
Reference:
Localization index of the address allocation
3. Link nodes together
Function Structure Link
4. Select the corresponding ’DC1136i’ confirmation section in the localization structure
(always a D-Bus address higher than the equivalent output section) and the same
’output element with confirmation’ (’EL out 2’)
5. Link nodes together
Function Structure Link
CAUTION: The two devices linked with the element ’EL out 2’ must belong to the same
DC1136 i.e. the input of a DC1136 may only be used as confirmation path to the output of
the same DC1136!
DC1136
No.1
’EL out 2’
outin
Links
Zone
Logical
structure
Physical
structure
DC1136
No.1
’EL out 2’
outin
Zone
DC1136
No.2
’EL out 1’
outin
Zone
Correct: Incorrect:
Station Station
’DE DS11a’
’DE DS11o’
’FU DS11a’ ’FU DS11a’
DC1136 as output element without confirmation
Use only in exceptional circumstances!
Element type to be used: ’Output element without confirmation’ (’EL out 1’)
Station
DC1136 is repre-
sented in the physical
structure by 2 individual
devices (out / in)
e.g. ’EL out 1’
’DE DS11a out’’DE DS11a in’
Logical
structure
Physical
structure
Links
Function unit
Zone

Table of Contents

Other manuals for Siemens Cerberus CS1140

Related product manuals