Configuration
5.2 Configuring workflow
1FW6 Built-in torque motors
94 Configuration Manual, 07/2017, 6SN1197-0AE00-0BP9
The configuration process produces the following results:
● A parts list of components required (Export to Excel)
● Technical specifications of the system
● Characteristic curves
● Comments on system reactions
● Installation information of the drive and control components
● Energy considerations of the configured drive systems
You can find additional information that you can download in the Internet at SIZER
(https://support.industry.siemens.com/cs/document/54992004/sizer-for-siemens-
drives?dti=0&pnid=13434&lc=en-WW).
STARTER drive/commissioning software
Core statement
The STARTER commissioning tool offers
● Commissioning
● Optimization
● Diagnostics
Table 5- 1 Article number for STARTER
STARTER
German, English, French, Italian, Spanish
6SL3072-0AA00-0AG0
Configuring workflow
Requirements
Your choice of torque motor depends on the following factors:
● The peak and rms torque of the duty cycle required for the application
● The required speed and angular acceleration
● The installation space available
● The required/possible drive arrangement
(single/parallel operation)
● The required cooling method