3.6.34 Extended dust protection (option M16)..................................................................................68
3.6.35 Signal and control cable (max. 2.5 mm²) (option M32)..........................................................68
3.6.36 IP54 degree of protection (option M54)..................................................................................68
3.6.37 Redundant fan in the power unit (option M61).......................................................................68
3.6.38 Suitability for marine use (option M66)...................................................................................68
3.6.39 Power cable connection at the drive output from above (option M78)...................................69
3.6.40 Capacitor release (option N20)..............................................................................................69
3.6.41 Controlled outgoing circuit for auxiliary equipment 400 V 3 AC (option N30).......................70
3.6.42 Sine-wave filter (option Y15)..................................................................................................71
4 Preparations for use...................................................................................................................................73
4.1 Requirements for installation location....................................................................................73
4.2 Inspections when receiving the delivery.................................................................................73
4.2.1 Checking the delivery.............................................................................................................73
4.2.2 Scope of delivery....................................................................................................................74
4.2.3 Checking shock and tilt indicators..........................................................................................74
4.2.4 Checking the load handling attachments...............................................................................75
4.3 Transportation........................................................................................................................76
4.3.1 Transport markings................................................................................................................76
4.3.2 Transport requirements..........................................................................................................76
4.3.3 Observe center of gravity.......................................................................................................77
4.3.4 Transport with a fork-lift truck.................................................................................................77
4.3.5 Transport with a crane...........................................................................................................78
4.3.6 Using lifting rods.....................................................................................................................78
4.3.7 Transporting transportation units packed in boxes................................................................80
4.4 Unpacking..............................................................................................................................81
4.4.1 Removing the packaging........................................................................................................81
4.4.2 Removing load securing devices...........................................................................................82
4.4.3 Lifting the cabinet off the transport pallet...............................................................................82
4.4.4 Opening doors in preparation for use.....................................................................................83
4.4.4.1 Opening doors in preparation for use.....................................................................................83
4.4.5 Checking the shock and tilt indicators inside the cabinet.......................................................84
4.5 Storage...................................................................................................................................84
4.5.1 Emptying the drive.................................................................................................................84
4.5.2 Storing a device.....................................................................................................................85
5 Installation..................................................................................................................................................87
5.1 Safety instructions for assembly............................................................................................87
5.2 Tools required........................................................................................................................88
5.3 Removing transport rails........................................................................................................88
5.4 Screwing the transport units together....................................................................................88
5.5 Connecting to the foundation.................................................................................................90
5.6 Connecting cabinets...............................................................................................................90
5.7 Connecting the DC bus..........................................................................................................91
5.8 Connecting the interface terminals.........................................................................................92
5.9 Connecting the water circuits.................................................................................................93
Table of contents
SINAMICS GM150 6SL3815-2LN41-4AA2
Operating Instructions 04/2017 7