Mounting and Commissioning
This chapter is intended for experienced commissioning staff. He must be familiar with the commissioning of
protection and control systems, the management of power systems and the safety rules and regulations.
Hardware adjustments to the power system data might be necessary. The primary tests require the protected
object (line, transformer, etc.) to carry load.
3.1 Mounting and Connections 232
3.2 Checking Connections 260
3.3 Commissioning 265
3
SIPROTEC 4, 7SJ61, Manual 231
C53000-G1140-C210-6, Edition 05.2016