12-4
The annual tests shall consist of all the inspection and testing procedures specified in the
previous clause and the following:
a. Visually inspect all detectors and sampling points for any condition which is likely to
adversely affect their operation, such as excessive deposition of dust or coating with
paint.
b. Remove at least one detector on each alarm zone circuit and confirm the fault signal is
registered at the appropriate alarm zone facility.
c. Check the operation of 20 percent of the installed heat detectors and 50 percent of the
installed smoke detectors, and sampling points in each alarm zone. The procedure for
testing shall be such that all detectors are checked not less than once every 5 years for
heat detectors, and not less than once every 2 years for smoke detectors, and sampling
points.
d. Detectors and sampling points that fail to operate shall be clearly marked and reported in
the logbook.
e. Check the operation of an ancillary control facilities and ensure that each controlled
device can be correctly initiated.
f. Check operation of all manual call points.
g. Check the power supply supervision alarm by disconnecting all power supplies to the fire
indicator panel, including battery supplies.
h. Visually inspect control and indicating equipment components for any evidence of
deterioration.
i. Check for any building alterations, changes in the environment, or utilisation of the
protected area which would require modifications to the system.
j. Ensure spare glasses for manual call points are available in the control panel and a tool
for replacing such glasses.
k. Record the results of all yearly maintenance procedures in the logbooks, including details
of detectors and sampling points that do not pass the visual inspection or fail to operate
satisfactorily, and notify the owner or his agent of any faults within the installation.
l. Check that each sprinkler monitor point i.e. pumps running, main stop valve shut etc.
operate correctly.
m. Test all stair pressurization fans for automatic and manual start-stop and correct status
indicator at the Fire Indicating Panel.
Annual Tests
Procedure
firealarmresources.com

Table of Contents

Other manuals for Simplex 4100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simplex 4100 and is the answer not in the manual?

Simplex 4100 Specifications

General IconGeneral
TypeFire Alarm Control Panel
ManufacturerSimplex
Model4100
Network CapabilityYes
AddressableYes
Power Supply120/240 VAC, 50/60 Hz
DisplayLCD
Annunciator SupportYes
Battery BackupYes
Releasing CapabilityYes
Max DevicesDepends on configuration
Max Notification Appliance Circuits (NAC)Varies with configuration
Max Releasing CircuitsVaries with configuration
Max Remote AnnunciatorsVaries with configuration
Communication PortsMultiple
Operating Temperature32°F to 120°F (0°C to 49°C)
Humidity RangeUp to 93% RH, non-condensing
NAC Outputs4 (expandable)
NetworkingYes

Related product manuals