56
7 First start-up
In order to warrant safety and function, a person assigned by the operator must carry out the following inspections.
Immediately eliminate detected deficiencies. Deficiencies may be remedied by an authorized and qualified specialist only.
7.1 Inspections before first start-up
Table
Checklist: Inspections before first start-up
Inspections to be performed
Electrical connection established correctly.
Mechanical connection established correctly.
The parameters set on the control are appropriate for the pump's intended application.
The performance characteristics for the aforementioned connections match the specifications in
the “Technical data”.
All components, e.g. lubrication lines, are pre-filled with the correct lubricating grease and
correctly installed.
No apparent damage, contamination, or corrosion.
Product is protected by a suitable pressure relief valve.
Any dismantled protective and monitoring equipment is fully reinstalled and functional.
All warning labels on the product are present and in proper condition.
The lubricant used matches the permissible specifications of the pump and the intended use.
7.2 Inspections during first start-up
Table
Checklist: Inspections during first start-up
Inspections to be performed
No unusual noises, vibrations, moisture accumulation, or odors present.
No undesired discharge of lubricant at connections (leakage).
Lubricant is fed without bubbles.
The bearings and friction points requiring lubrication receive the planned lubricant volume.