Mount the expanded metal, reinforcement fabrics or similar
in the cistern area. Apply a layer of plaster of at least
mm thick (measured from the front edge of the splash
guard) to the wall.
Remove the brick-wall bare-wall protection.
Remove the protective foils from the bonding surfaces on
the installation frame, and stick them, together with those
of the support frame onto the plastered surface. Observe
the correct position of the “TOP” marking, and ensure
horizontal alignment.