EasyManua.ls Logo

TECE Lux Mini - Installing TECEsquare II Metal Flush Plate

TECE Lux Mini
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the TECEsquare II metal toilet flush
plate
The TECEsquare II is an extra-flat metal flush plate with
two spring-mounted actuation rocker buttons. The product
comes with the toilet installation frame already integrated.
The first four steps for installing the manual toilet flush
plate are the same for all TECE flush plates:
1
Open the corner valve and suciently flush out the pipe.
2
Turn the corner valve to close it again and connect the
reinforced hose to the filling valve. If you wish to fill the
cistern with water (e.g. for the initial operation), you must
open the corner valve again.
3
Put the splash guard back on.
4
The activation hooks must fit correctly in the drain valve's
drawbar eyelets. Tighten the splash guard clamping
screws.
5
25 mm
Screw in both attachment rods – distance of attachment
rods to wall surface =  mm.
-
Flush plates

Table of Contents

Related product manuals