TRANSPORTATION AND INSTALLATION MANUAL
142
Fig. 12.3 Internal connection diagram (TSL3100)
For solenoid valve (optional)
For hand IO installation position change (optional)
Used at the time of installation
of the solenoid valve (optional)
To the sequencer and others
(Cable connected by customer)
Used at the time of installation of
the IO arm 2 for hand (optional)
Used at the time of installation of
the IO arm 3 for hand (optional)
Used at the time of installation of
the IO arm 3 for hand (optional)
To robot hand
(Cable connected by customer)
Connector for customer
Connector: JN2FS10SL2-R*JAE
Contact: JN1-22-22S-PKG100*JAE
Used at the time of installation of
the IO arm 2 for hand (optional)