EasyManua.ls Logo

TRIMOS V7 - SETTING UP

Default Icon
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User's Manual
750 50 0042 03 10
3. SETTING UP
3.1 Packing List
The standard packing of the instrument includes the following elements:
V7 V9
1. Instrument with display unit and
connection cable (HDMI)
2. Measuring insert
3. Setting gauge
4. Charging unit
5. Protection cover
6. User's manual
7. Calibration certificate
While unpacking, carry the instrument by lifting if by its displacement handle and
body. In NO case should the instrument be carried by the handle for carriage
displacement (3). Keep the original packaging for future transportation.
If the instrument has been stored at a temperature below 5°C, wait a few hours
before unpacking to prevent the instrument parts from condensation.
Condensation can affect sensitive parts of the instrument.

Table of Contents

Related product manuals