(2) Installation
Reassemble in reverse order of removal.
1) Install the axle bracket on the engine.
2) Retighten the nuts (6pcs)
3) Connect the piping of the power steering
system.
4) Install the condenser and the receiver dryer
(Freezer hose) on the radiator bracket.
5) Connect the upper, lower and drain radiator
hoses.
6) Install the air cleaner assembly and the inlet
pipe of the air cleaner.
7) Connect the wiring of the engine harness
and other electric wire
8) Connect the ground strap and the battery
cables.
9) Install the engine hood.
10) Install the side covers.
11) Fill the radiator with coolant.
12) Install the drive shaft (4WD)
3.SEPARATION OF THE ENGINE
AND THE FRONT TRANSMISSION.
Parts which can be inspected during this
operation.
-Fly wheel -Main clutch
(1) Removal
1) Remove the front drive shaft.
( In case of the 4WD version )
2) Support the engine on the bottom with a jack
or stands.
3) Hold the transmission with a garage jack or a
crane so that the transmission side can be
moved when needed.
4) Remove engine hood assembly.
(Electrical wire Included)
With the hood up, the Hook release lever can
be removed by pulling left, remove the gas
damper and pin
2-7
Fig.2-11
Hook release lever