27
3.3.3 Installing Optional 4-Post Flush Mounting Kit for Data Cabinets, P/N 559801
Adds strength when flush mounting the system in 19” mounting rails of a compliant data cabinet. Mounts to the inside surfaces of the
data cabinet’s vertical rails. Adjustable Depth: from 23.0 in [584 mm] to 30.0 in [762 mm]. Weight Load: 160 lbs.
Procedure
1. See Figure 3.18 for an assembly illustration.
Installing Field Expansion Module Mounting Assembly Spacer Kit, P/N 560075
Provided with List 34, 36 field expansion module mounting assemblies is spacer kit (P/N 560075) for use with the 4-post flush
mounting kit for data cabinets. Mounts to the inside surfaces of the data cabinet’s vertical rails.
NOTE!
Installation instructions for the Field Expansion Module Mounting Assembly Spacer Kit, P/N 560075 is provided in the
User Instructions (UM582137100).

Table of Contents

Other manuals for Vertiv NetSure 5100 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv NetSure 5100 Series and is the answer not in the manual?

Vertiv NetSure 5100 Series Specifications

General IconGeneral
BrandVertiv
ModelNetSure 5100 Series
CategoryPower Supply
LanguageEnglish

Related product manuals