Vertiv™ NetSure™ 5100 Series -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
70
5.5 Assemblies Comprising the Power System Frame Grounding Connection
The module mounting assemblies have M4 frame ground studs located on the rear panel. Refer to PD588705300 for location.
List 40, List 45, and List 46 have 10-32 grounding studs located on the assembly. Refer to Figure 5.3, Figure 5.4, and Figure 5.5 for
location.
5.6 Central Office Ground Connection
Landing points are provided on the battery return bus for a central office ground lead (see Figure 5.66, Figure 5.67, Figure 5.71,
Figure 5.72, or Figure 5.76). For central office grounding requirements, refer to the current edition of the American National Standards
Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC), applicable local codes, and
your specific site requirements.

Table of Contents

Other manuals for Vertiv NetSure 5100 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv NetSure 5100 Series and is the answer not in the manual?

Vertiv NetSure 5100 Series Specifications

General IconGeneral
BrandVertiv
ModelNetSure 5100 Series
CategoryPower Supply
LanguageEnglish

Related product manuals