INSTALLATION CUTMASTER 10MM, 12MM
Manual 0-5230 3-5 Installation
3.05 Input Wiring Specifications
CUTMASTER 10mm Input Power Requirements
Input Power Input Current Input Current Input
Suggested Sizes (See
Note)
Voltage Frequency (kVA) Max (Amps) I
1
eff (Amps) Fuse (Amps)
(Volts-AC) (Hz) 1-Ph 1-Ph 1-Ph 1-Ph
240 50/60 3.8 15.6 9.9 16
Line Voltages with Suggested Circuit Protection
Motor start fuses or thermal circuit breakers are recommended for this application. Check local requirements for your
situation in this regard.
CUTMASTER 12mm Input Power Requirements
Input Power Input Current Input Current Input
Suggested Sizes (See
Note)
Voltage Frequency (kVA) Max (Amps) I
1
eff (Amps) Fuse (Amps)
(Volts-AC) (Hz) 1-Ph 1-Ph 1-Ph 1-Ph
240 50/60 5.0 20.8 13 16
Line Voltages with Suggested Circuit Protection
Motor start fuses or thermal circuit breakers are recommended for this application. Check local requirements for your
situation in this regard.
NOTE
Refer to Local and National Codes or local authority having jurisdiction for proper wiring requirements.
Cable size is de-rated based on the Duty Cycle of the equipment.
The suggested sizes are based on flexible power cable with power plug installations.
Cable conductor temperature used is 167° F (75° C).