EasyManua.ls Logo

Waters SYNAPT G2 - Assembling the T-Wave Ion Guide Assembly; Fitting the T-Wave Ion Guide Assembly, PEEK Ion Block Support, and Ion Block Assembly to the Source Assembly

Waters SYNAPT G2
236 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-54 Maintenance Procedures
Assembling the T-Wave ion guide assembly
Required materials
Chemical-resistant, powder-free gloves
Jeweler’s screwdriver
To assemble the T-Wave ion guide assembly
1. Fit the aperture plate to the T-Wave ion guide assembly.
2. Using the jeweler’s screwdriver, fit and tighten the 3 screws securing the
aperture plate to the T-Wave ion guide assembly.
3. Fit the locating ring to the T-Wave ion guide assembly.
4. Fit the metallized O-ring to the T-Wave ion guide assembly.
Requirement: Fit a new metallized O-ring, if necessary.
5. Using the jeweler’s screwdriver, fit and tighten the 3 screws securing the
locating ring to the T-Wave ion guide assembly.
Fitting the T-Wave ion guide assembly, PEEK ion block support,
and ion block assembly to the source assembly
Required materials
Chemical-resistant, powder-free gloves
3-mm Allen wrench
Lint-free cloth
HPLC-grade (or better) 1:1 methanol/water
New seals and O-rings
Caution: To avoid recontaminating the T-Wave ion guide assembly,
wear clean, chemical-resistant, powder-free gloves during this
procedure.

Table of Contents

Other manuals for Waters SYNAPT G2

Related product manuals