EasyManua.ls Logo

Waters SYNAPT G2 - 5 Maintenance Procedures

Waters SYNAPT G2
236 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-1
5 Maintenance Procedures
This chapter provides the maintenance guidelines and procedures
necessary to maintain the instrument’s performance.
Keep to a maintenance schedule, and perform maintenance as required
and described in this chapter.
Contents
Topic Page
Maintenance schedule 5-3
Spare parts 5-4
Troubleshooting using Connections Insight 5-5
Safety and handling 5-6
Preparing the instrument for work performed on its source 5-7
Removal and refitting of the source enclosure 5-8
Installing and removing the corona pin 5-12
Operating the source isolation valve 5-15
Removing O-rings and seals 5-17
Cleaning the mass spectrometer case 5-18
Emptying the nitrogen exhaust trap bottle 5-19
Cleaning the source components 5-21
Cleaning the sampling cone assembly 5-21
Cleaning the extraction cone 5-31
Cleaning the ion block assembly 5-38
Cleaning the source T-Wave ion guide assembly 5-49
Replacing the ESI probe tip and gasket 5-55
Replacing the ESI probe sample capillary 5-59
Cleaning the APCI probe tip 5-67
Replacing the APCI probe sample capillary 5-68
Replacing the LockSpray probe capillary 5-74

Table of Contents

Other manuals for Waters SYNAPT G2

Related product manuals