EasyManua.ls Logo

Waters SYNAPT G2 - Preparing the Intellistart Fluidics System; Installing the Vials

Waters SYNAPT G2
236 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-4 Starting Up and Shutting Down the Mass Spectrometer
Preparing the IntelliStart Fluidics system
For additional information, see “Connecting the liquid waste line” on
page B-13.
Installing the vials
Use standard vials (30 mL) for instrument setup and calibration. To infuse
relatively small volumes, use the Low-volume Adaptor Kit (included). The
volume of the low-volume vials is 1.5 mL.
Required materials
Chemical-resistant, powder-free gloves
To install the vials
1. Remove the vial caps.
2. Screw the vials onto the mass spectrometer, as shown below.
Warning: The vials can be contaminated with biohazardous and/or
toxic materials. Always wear chemical-resistant, powder-free
gloves while performing this procedure.
Vial

Table of Contents

Other manuals for Waters SYNAPT G2

Related product manuals