EasyManuals Logo

Waters TQ Detector User Manual

Default Icon
235 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #128 background imageLoading...
Page #128 background image
5-60 Maintenance Procedures
19. Check for leaks in the assembly by attaching the free end of the PEEK
tubing to an LC pump and pumping 1:1 acetonitrile/water through it at
1mL/min.
20. If leakage occurs, disassemble and remake the connection, and then
repeat the leak test.
21. When performing the leak test, check the backpressure on the LC pump,
which will be relatively high if the capillary is blocked. If this is the case,
replace the capillary.
22. When the leak test is performed successfully, disconnect the PEEK
tubing from the LC pump.
23. Remove the PEEK tubing and compression screw from the LC union.
24. Slide the conductive sleeve onto the capillary, and then feed the
capillary through the probe.
Conductive sleeve

Table of Contents

Other manuals for Waters TQ Detector

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Waters TQ Detector and is the answer not in the manual?

Waters TQ Detector Specifications

General IconGeneral
BrandWaters
ModelTQ Detector
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals