EasyManuals Logo

3D Systems ProX 800 User Manual

3D Systems ProX 800
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
3D Systems, Inc.
65
2. When TPM bath nishes, unclamp the build platform from the RAMCO platform and hold build platform perpendicular to the
RAMCO vat to drain excess TPM.
3. Move build platform onto IPA RAMCO at a slant and ip the switch on the console (circled below-right) to start the IPA bath.
4. After IPA bath is nished, hold build platform at an angle above the IPA vat to drain excess IPA.
5. Set build platform on ooad cart or other large, sturdy cart to prepare for part removal.
6. With nitrile gloves on, use a putty knife or other viable tool to scrape the build’s supports off the build platform.
7. Carefully remove other support structures by hand.
Drain excess TPM over TPM RAMCO. Put build platform on IPA RAMCO.

Table of Contents

Other manuals for 3D Systems ProX 800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the 3D Systems ProX 800 and is the answer not in the manual?

3D Systems ProX 800 Specifications

General IconGeneral
Brand3D Systems
ModelProX 800
Category3D Printers
LanguageEnglish

Related product manuals