EasyManua.ls Logo

ABB IRB 8700 Series - Page 375

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the upper arm shafts
NoteAction
xx1500002724
Before continuing, make sure that the up-
per arm is secured in the lifting accessories
and overhead crane.
Stretch the lifting accessories to take the
weight of the upper arm.
CAUTION
The upper arm including the wrist weighs
approximately 900 kg. All lifting accessor-
ies must be sized accordingly.
1
In order to release the brakes, connect the
24 VDC power supply.
2
Connect connector R2.MP2:
pin 2 = 24V
pin 5 = 0V
Release the brakes on axis-2 to allow the
lower arm to position according to the lift-
ing force applied from the overhead crane.
This eliminates any strain in the upper arm
shafts.
3
Remove the brake release from R2.MP2.4
xx1500002725
Remove grease and other contamination
from the axis-2 and axis-3 shaft ends and
around the KM nuts, on both sides.
5
Continues on next page
Product manual - IRB 8700 375
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.5.6 Replacing the complete lower arm
Continued

Table of Contents

Related product manuals