EasyManua.ls Logo

ABB IRB 8700 Series - Page 644

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lifting the complete robot onto the supporting pillars
NoteAction
CAUTION
Make sure that the robot is secured in the
lifting accessories.
1
Unscrew the attachment screws that secure
the robot to the foundation.
2
Supporting pillars: 3HAC061213-001Use caution and lift the complete robot up,
high enough to be able to attach the sup-
porting pillars to the foundation.
3
Follow user instructions enclosed with the
pillars.
Fit the supporting pillars to the foundation
with the enclosed attachment screws.
4
Tightening torque: 325 Nm
Use caution and lower the robot slowly
down onto the supporting pillars, making
sure the holes in robot base will match the
holes in the pillars.
5
Follow user instructions enclosed with the
pillars.
Secure the base to the supporting pillars
with the robot attachment screws.
6
Tightening torque: 325 Nm
xx1700000928
Disconnecting the cable harness in the base
NoteAction
DANGER
Make sure that all supplies for electrical
power, hydraulic pressure, and air pressure
are turned off.
1
Continues on next page
644 Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox
Continued

Table of Contents

Related product manuals