EasyManua.ls Logo

ABB IRB 8700 Series - Page 659

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lifting complete arm system onto base and axis-1 gearbox
NoteAction
Guide pins: M16x300Attach two guide pins in opposite threaded
holes of the gearbox.
1
xx1700000934
Loosen the cable bracket in the frame, to
give space to the guide pin in the gearbox
during refitting of arm system.
2
CAUTION
The complete armsystem weighs 4,300 kg.
All lifting accessories used must be sized
accordingly.
3
Use caution and lift the complete arm sys-
tem up.
4
Clean contact surfaces between base in-
cluding gearbox, cross roller bearing and
frame.
DANGER
Let only one hand stay underneath the
hanging gearbox while cleaning.
5
Flange sealant: Loctite 574
xx1600000045
Apply flange sealant (Loctite 574) on the
sealing surface for the cross roller bearing
on the base.
6
Continues on next page
Product manual - IRB 8700 659
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox
Continued

Table of Contents

Related product manuals