EasyManua.ls Logo

ABB IRB 8700 Series - Page 666

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Performing a leak-down test
NoteAction
See Performing a leak-down test on
page 184.
Perform a leak-down test.1
Preparations before refitting the axis-1 motor
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure and air pressure are turned
off.
1
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
2
Wipe clean the contact surfaces from any remain-
ing contamination.
3
Also wipe clean the o-ring groove.
O-ring, 3HAB3772-107
xx1200001019
Inspect the o-ring.
Note
Replace if damaged.
4
xx1200001020
Make sure the o-ring is seated in the groove.
Tip
Lubricate the o-ring with some grease for a better
fitting in the groove.
5
Continues on next page
666 Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-1 gearbox
Continued

Table of Contents

Related product manuals