EasyManua.ls Logo

ABB IRB 8700 Series - Page 759

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Tip
To make sure that all screws in this area are
torqued, use a marker pen and mark each screw
after it has been torqued.
3
Examine that all screws in this area now has been
torqued.
4
Concluding procedure
NoteAction
See Performing a leak-down test on
page 184.
Perform a leak-down test (if not already
done).
1
See Changing oil in axis-2 and axis-3
gearbox on page 147.
Refill the gearbox with oil.2
Axis Calibration is described in Calibrating
with Axis Calibration method on page 805.
Recalibrate the robot.3
General calibration information is included
in section Calibration on page 795.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section First test
run may cause injury or damage on
page 27.
4
Product manual - IRB 8700 759
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals