MODULE 5: MISCELLANEOUS
ARCHITECT
®
RSH System Service Training Guide 5-5
201532-102 FOR INTERNAL USE ONLY
PLANNED MAINTENANCE
The Planned Maintenance Checklist can be located in the ARCHITECT Service and Support Manual,
Planned Maintenance Section. It contains suggestions for planned and as needed maintenance. Any
deviation or change from these suggestions due to or based on local, country, or area operating procedures
and business needs must be documented and approved locally.
NOTE: A translated, locally approved, copy of this checklist may be provided by the
local service area/country organization.
The PM has been divided into intervals. The intervals are time-based dependent on the analyzer
installation date.
PM Procedures for the RSH are incorporated into the Processing Module PMs and/or outlined in the ISA
Database. The following RSH procedures are contained in the c8000
®
System or i2000
SR
®
System PM
procedures:
• P-169 Clean Filter RSH Card Cage Filters
• Verify smoked doors are closing properly
• M&D 6311 RSH Cleaning
• Inspect and Lubricate RSH
• Lubricate Pulley
- M&D 1119 Transport Calibration
- M&D 3222 RSH Bar Code Calibration
- M&D 1111 & 1117 Pipettor Calibrations
PM: Planned Maintenance
• Consists of procedures designed to maintain the performance of the system
Time Period PM Procedure
Quarterly from analyzer installation date/anniversary PM #B
Annually from analyzer installation date/ anniversary PM #C
Monthly from analyzer installation date/anniversary PM #D