EasyManua.ls Logo

Abbott ARCHITECT RHS - Installation Procedures

Abbott ARCHITECT RHS
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODULE 5: MISCELLANEOUS
5-6 ARCHITECT
®
RSH Service Training Guide
FOR INTERNAL USE ONLY 201532-102
INSTALLATION
ARCHITECT RSH Installation procedures are designed to install RSH system hardware on to a standalone
ARCHITECT
®
c8000
®
or i2000
SR
®
System and verify the system hardware is performing within
specification.
Use the ARCHITECT RSH and corresponding ARCHITECT System Service and Support
Manual, Section 7 Pre-Site Interview and Inspection and Section 8 Installation to view the
checklists discussed below.
General Installation
The Installation Checklist can be located in the ARCHITECT RSH System Service and Support Manual,
Section 8 Installation. It contains the procedures that are required to, unpack, setup, and verify
performance. Follow checklist for efficiency and proper sequence.
Installation consists of:
Unpacking RSH
Hanging the RSH on the Processing Module
Installing the RSH Card Cage and corresponding boards (c8000
®
Standalone System only)
Connecting Cables from Card Cage to RSH
Installing RSH covers and end caps
Calibration of robotic positions
Performance Verification Test
Installation Tips:
RSH Clamps too loose or not seated in PM pocket properly will result in Sample Pipettor
Calibration failure; the probe misses the target.
Ensure the RSH is aligned left to right of PM prior to seating and tightening clamps.
Lubricate pulley prior to tightening belt.
Ensure belt is properly placed in bearing (full back position at the black timing mark) and
pulley is fulled extended for proper belt tension.

Table of Contents

Related product manuals