-V BAG0087.11 01.20
For spread rate checks with a calibration device on the side:
1. Slide insert 3 such that the value for the real flow rate (above
insert 3) is lined up on top of K.
2. Look for the value for the desired flow rate (below insert 3) and
read off the shutter position to be set above it.
Working width: 24 m, target quantity: 250 kg/ha,
forward speed: 12 km/h:
→ Desired flow rate: 1.0 kg/s
From the spread rate check: flow time: 10 s, collected fertiliser
quantity: 9 kg
→ Real flow rate: 0.9 kg/s
Real flow rate: 0.9 kg/s, desired flow rate: 1.0 kg/s
→ Shutter position to be set: 48