EasyManua.ls Logo

Applied Biosystems 7300 - Replacing the Instrument Fuses

Applied Biosystems 7300
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7 Verifying the Instrument Performance
Analyzing the TaqMan
®
RNase P Plate Data
96 Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Notes
c. In the Well Inspector, select Omit Well.
d.
Click (or select
Analysis
Analyze
)
to
reanalyze the run without the outlying data.
8. Repeat step 7 on the previous page for other
wells with outlying data.
IMPORTANT! Up to six wells from each
replicate group in a RNase P plate can be omitted
to meet specifications. If the analysis contains
more than six outliers,
troubleshoot the RNase P
verification run. See “Troubleshooting” on
page 99.
9. In the Results tab, select the Standard Curve
tab.
10. In the Standard Curve tab, verify that the R2
value is 0.990.
11. In the Results tab, select the Report tab.
Select
Omitted well
is crossed-out
Select
Must be 0.99
Select

Table of Contents

Other manuals for Applied Biosystems 7300

Related product manuals