EasyManua.ls Logo

Applied Biosystems 7300 - Page 142

Applied Biosystems 7300
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A
Moving the 7300/7500/7500 Fast System
116 Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Notes
5. Run a TaqMan
®
RNase P Instrument Verification
plate (see page 87).
If the run passes, recalibrations are not
necessary.
If the run fails, perform steps steps 6
through 9 to recalibrate the instrument.
6. Perform an ROI calibration (see page 35).
7. Perform a Background calibration (see page 49).
Perform an optical calibration if you are using a
7500 or 7500 Fast system (see page 59).
8. Perform a pure dye calibration (see page 67).
9. Perform an instrument verification run (see
page 87).

Table of Contents

Other manuals for Applied Biosystems 7300

Related product manuals