2.5. OSCP POST-INSTALLATION FUNCTIONALITY TEST
This section presents the steps to validate the proper operation of the EDSS fit with the
OSCP. The following paragraphs present the steps to follow.
2.5.1. STEP 1: SIGNS SYSTEM STARTUP
This section presents the steps to validate the proper operation of the signs system fit with
the OSCP. Following paragraphs present the detailed steps.
The following window automatically displays:
Test mode automatically runs and allows to display a sequence of messages on the signs to
validate proper operation. The sequence is as follows:
Alternating squares on and off;
Alternating lines on and off (one line every four lines);
Axion's logo;
User Manual (Revision A) Document No.: 3042145 Page 21
Figure 16: OSCP Startup
Figure 17: Message Management

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Axion 40 Series and is the answer not in the manual?

Axion 40 Series Specifications

General IconGeneral
BrandAxion
Model40 Series
CategoryControl Unit
LanguageEnglish