EasyManua.ls Logo

BD LSR II - Page 45

BD LSR II
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Instrument Setup 45
1 Make sure that the flow cytometer is in STNDBY mode.
2 Disconnect the air line (green) from the sheath container (Figure 2-3 on
page 44).
3 Depressurize the sheath container by pulling up on its vent valve.
4 Remove the sheath container lid.
Unscrew the clamp knob and lift.
5 Add 6 L of sheath fluid, such as BD FACSFlow™ solution, to the sheath
container.
NOTICE Do not fill the sheath tank to its maximum capacity (8 L). When
a full tank is pressurized, erratic instrument performance can result.
; Tip For calcium-flux experiments, use a sheath fluid that does not contain
preservatives. For example, use 1X phosphate-buffered saline (PBS).
6 Close the sheath container lid.
7 Reconnect the air line (green).
8 Make sure the lid is tightly sealed with the gasket in place, the clamp knob
is finger-tight, and that the cytometer fluid line (blue) is not kinked.
; Tip Inspect the sheath container periodically, as sheath fluid can cause
corrosion.
LSR2.book Page 45 Tuesday, April 25, 2006 3:34 PM

Table of Contents

Related product manuals