161
20 08 CONTESSA
ELECTRICAL SYSTEMS - HOUSE — 8
Pre-Start Checks
Prior to the rst start of the day perform a
general inspection including oil and coolant
levels. Keep a maintenance log on number of
hours in operation since the last service. Perform
any service or maintenance that may be due.
WARNING:
Disable the Auto Gen Start feature
before servicing the generator.
Before Starting the Generator:
Clear people and animals from hazards
of electrical shock and moving parts.
All appliances and other large AC
electrical loads must be off.
NOTE:
The generator may require priming. To
prime hold control switch in the OFF
position. Repeat if necessary. The diesel
generator fuel pick-up tube is cut to
approximately ¼ tank so as not to run
the main engine out of fuel.
Starting the Generator
Push and hold the control switch
in START position until the
generator starts. Release switch.
On diesel models, the control
switch may ash up to 15 seconds,
indicating engine preheat.
WARNING:
Excessive cranking can overheat and
damage the starter motor. DO NOT
crank the engine more than 30 seconds at
any one time. Wait at least two minutes
before resuming. If the generator fails to
start refer to the manufacturer’s manual.
10 Kw
42' models only.
240 Volt AC.
060144p
090492
Located behind access door on the 10.0 Kw
generator only.
060144bA
020159b
8 Kw
020159d
8 Kw
40' and smaller only.
120 Volt AC.
080357