411829-L, Operation April 2012 Page 4-20
4
NOTE
When using an Isolera Four system, queued equilibrations take priority
over queued gradient runs.
Figure 4-15. Run Parameters and Estimation Dialogs
Figure 4-16. Status Tab (Isolera LS and Isolera Four EXP
with Spektra License Shown)
Isolera One EXP and
Isolera LS
Rack positions for
120 ml racks:
Isolera Four EXP
Rack positions for
16x100 mm racks:
Task field