EasyManua.ls Logo

BridgeTech VB20 - Page 112

BridgeTech VB20
261 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T2MI (T2MI Option)
Container
stream:
For an T2MI inner stream the container stream (outer stream)
must be specified. Select the container stream from the drop-
down menu. For streams other than T2MI inner streams (none)
should be selected.
Data PID: The container stream PID carrying the inner stream
PLP ID: The PLP ID for the inner stream. Select a fixed PLP ID value from
the drop-down menu or specify that the first detected PLP ID
should be used.
Other
Has FEC: The user should specify if a stream uses COP3 forward error
correction.
PROBE USERS' MANUAL VERSION 5.0
2014 © BRIDGE Technologies Co AS - Bentsebrugata 20 - N-0476 Oslo, Norway - tel: +47 22 38 51 00 -
www.bridgetech.tv
113

Table of Contents