TT100 In-Line Viscometer Installation, Operation, Maintenance and Service Instructions
P/N M/97-520 3-3
Figure 3-1: Typical Installation Calibration Flowchart
Install
Viscometer
(Refer to Section 2)
Perform Coarse Zero
Calibration
(Refer to Page 3-18)
START
END
Operate
Viscometer
(Refer to Section 4)
Did the Fine Zero
Calibration Test
Pass or Fail?
PASS
Perform Fine
Zero Milliampere
Calibration Test
(Refer to Page 3-6)
FAIL
Perform Fine Zero
Voltage Calibration
(Refer to Page 3-21)