EasyManua.ls Logo

CFG STE35SR - Maintenance Schedule

Default Icon
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION & MAINTENANCE MANUAL STE35SR
111
Maintenance schedule
If the machine is equipped with hydraulic hammer, the maintenance schedule of some parts is
different. For details, see "Maintenance Cycle when Using hydraulic hammer" to determine the
correct maintenance schedule when performing maintenance.
Maintenance schedule
Maintenance schedule and procedures refer to the maintenance Table, which is pasted on the
vehicle.
Check before operation
For details of the following items, see "Pre-job inspection" in the operations section.
Cooling system coolant level - check/fill
Engine oil level - check/fill
Fuel oil level - check/fill
Air filter dust indicator - check
Hydraulic oil level - check/fill
Electrical wiring - Inspection
Horn function - check
Irregular maintenance
Air filter element - inspection/cleaning
Internal cleaning of cooling system - cleaning/replacement
Water and sediment in the fuel prefilter - discharge
Water and sediment in fuel tank - discharge
Track tension - check/adjust (machine with metal track board, road liner)
Bucket teeth - replacement
First 50 hours of maintenance (first 50 hours only)
Engine oil and oil filter element - replacement
The first 500 hours of maintenance (only in the first 500 hours, and also every 250
hours of maintenance)
Fuel fine filter element - replacement
Gear oil for walking reducer - replacement
The first 1000 hours of maintenance (only in the first 1000 hours, at the same time
every 500 hours of maintenance)
Hydraulic oil return filter element - replacement
Air filter main filter element and safety filter element - replacement
Every 8 hours maintenance
For details on the following items, see the Operation/Maintenance section.
Working device grease – fill

Table of Contents