Figure 54: Removing the Air Baffle
What to do next
Removing the CEM Top Cover, on page 94
Removing the CEM Top Cover
The CEM Board has its own sheetmetal cover that must be removed to gain access to the fasteners that secure
the CEM to the server.
The CEM cover is secured by:
• Six (6) M3xL6mm Phillips screws
• Two (2) M3x L10.2 thumb screws
Gather a #2 Phillips screwdriver before attempting this procedure.
Cisco UCS C885A M8 Server Installation and Service Guide
94
Recycling Server Components
Removing the CEM Top Cover