Figure 37: Replacing the HGBB Tray
Removing and Replacing CPU Tray
To reduce the risk of injury from electric shock, shut down the server and remove all power cords to disconnect
power from the system completely.
Warning
Cisco UCS C885A M8 Server comes with the following CPU sled options:
• C885A-M8-CC-SLD01
• C885A-M8-CC-SLD02
• C885A-M8-CC-SLD03
• C885A-M8-CC-SLD04
• C885A-M8-CC-SLD05
Cisco recommends replacing the tray with one that has the same PID.
Note
Cisco UCS C885A M8 Server Installation and Service Guide
51
Maintaining the Server
Removing and Replacing CPU Tray