b) Grasp the middle air baffle and lift it up to detach it from the server.
Figure 110: Removing the Middle Air Baffle
Step 8 Remove the cable holder assembly.
a) Disconnect the power cables from the CPU Tray's motherboard.
Figure 111: Disconnecting the Cables
b) Remove the cable holder cover (1) and cable clips (2).
Cisco UCS C885A M8 Server Installation and Service Guide
149
Recycling Server Components
Recycling Server Components