Figure 124: Loosening the Thumbscrew and Location of the Screws
b) Grasp the CEM Riser Assembly and lift it out of the server.
Figure 125: Removing the CEM Riser Assembly (Right CEM)
c) Repeat this step for each CEM Riser Assembly.
Step 5 Remove the PCIe Cards from the CEM Riser.
a) Remove the two or three screws (depending on how many PCIe cards are installed).
Cisco UCS C885A M8 Server Installation and Service Guide
157
Recycling Server Components
Recycling Server Components