Figure 151: Location of Thumbscrew
b) Release the power distribution board from the three retaining posts (1) and remove the PDB (2).
Figure 152: Location of the Retaining Posts
c) Using a Phillips screwdriver, remove the six screws.
Cisco UCS C885A M8 Server Installation and Service Guide
173
Recycling Server Components
Recycling Server Components