System Configuration SiEN18-622
184 System Configuration
1. System Configuration
1.1 Operation Instructions
After the installation and test operation of the room air conditioner have been completed, it should be operated and handled as
described below. Every user would like to know the correct method of operation of the room air conditioner, to check if it is
capable of cooling (or heating) well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time can be said to reduce about 80%
of the requests for servicing. However good the installation work is and however good the functions are, the customer may blame
either the room air conditioner or its installation work because of improper handling. The installation work and handing over of the
unit can only be considered to have been completed when its handling has been explained to the user without using technical
terms but giving full knowledge of the equipment.