7. Commissioning
Installation and Operation Manual for RPI M50A
52
7. Commissioning
The inverter must be correctly installed, see “6. Installation”, p. 37.
For information on how the display is operated, see “4.3 Display, buttons, status LEDs”, p. 12.
DISCONN AC/DC
OFF ON
To execute commissioning, the inverter needs to be powered either by AC
(the grid) or DC (the solar modules).
After powering up the inverter for the fi rst time, the Select language dialog
is shown.
➔
Deutsch
English
1. Use the buttons and to select language English.
To confi rm your selection, press the button
ENT
.
CZECH
ENGLAND
2. Use the buttons and to select your country or grid type.
To confi rm your selection, press the button
ENT
.
United Kingdom
set country:
3. If the selected country is correct, use the buttons and to
select the entry YES.
To confi rm your selection, press the button
ENT
.
If you want to change your selection, press the button
ESC
.
→ The inverter starts a self-test which takes approximately 2 min-
utes. A countdown shows the remaining time on the display.
þ
The basic setup is fi nished. The standard menu is shown.
Puissance: 0W
Etat: On Grid
10.Sep 2014 15:32
► Check chapter “8. Settings”, p. 53 whether you need to adjust addtional set-
tings.