EasyManuals Logo

Delta RPI M50A_120 User Manual

Delta RPI M50A_120
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #52 background imageLoading...
Page #52 background image
7. Commissioning
Installation and Operation Manual for RPI M50A
52
7. Commissioning
The inverter must be correctly installed, see “6. Installation”, p. 37.
For information on how the display is operated, see “4.3 Display, buttons, status LEDs”, p. 12.
DISCONN AC/DC
OFF ON
To execute commissioning, the inverter needs to be powered either by AC
(the grid) or DC (the solar modules).
After powering up the inverter for the fi rst time, the Select language dialog
is shown.
Français
Deutsch
English
Select language
1. Use the buttons and to select language English.
To confi rm your selection, press the button
ENT
.
CHINA 2013
CHINA MV
CZECH
ENGLAND
FRA-Is 50HZ
2. Use the buttons and to select your country or grid type.
To confi rm your selection, press the button
ENT
.
YES / NO
United Kingdom
set country:
Are you sure to
3. If the selected country is correct, use the buttons and to
select the entry YES.
To confi rm your selection, press the button
ENT
.
If you want to change your selection, press the button
ESC
.
The inverter starts a self-test which takes approximately 2 min-
utes. A countdown shows the remaining time on the display.
þ
The basic setup is fi nished. The standard menu is shown.
E-actuelle: 0kWh
Puissance: 0W
Etat: On Grid
10.Sep 2014 15:32
Check chapter “8. Settings”, p. 53 whether you need to adjust addtional set-
tings.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta RPI M50A_120 and is the answer not in the manual?

Delta RPI M50A_120 Specifications

General IconGeneral
BrandDelta
ModelRPI M50A_120
CategoryInverter
LanguageEnglish

Related product manuals