 Powering down/up applications (examples)
Servicing the Network Management Module – 162
Enter the password in the Password field.
Click Login. The Network Module web interface appears.
2. Navigate to Contextual help>>>Settings>>>Certificatepage
3. In theTrusted remote certificates section, click Import, selectProtected applications (MQTT) and thenclick on CONTINUE
4. Select the client.pem file previously saved, click Open. Communication with the agent is restored.
4.3 Powering down/up applications (examples)
4.3.1 Powering down IT system in a specific order
4.3.1.1 Target
Powering down applications first (when on battery for 30s), database servers next (3min after the applications), and storage last (as
late as possible).
4.3.1.2 Step 1: Installation setup
4.3.1.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
It also allows IT equipment to sequentially restart on utility recovery (Restart sequentially the IT equipment on utility recovery).
4.3.1.2.2 Resulting setup
UPS provides outlets (Group 1 and Group 2) and a primary output.
Connections to UPS are done as described below:
Group 1: Applications
Group 2: Database servers
Primary: Storage
When primary shuts OFF, both group 1 and group 2 shut OFF immediately.