 Powering down/up applications (examples)
Servicing the Network Management Module – 168
Non-priority equipmentimmediately shuts down when on battery for 10s to keep battery power for critical equipment.
4.3.3 Restart sequentially the IT equipment on utility recovery
4.3.3.1 Target
Restart the storage first (right after utility recovery), database servers next(2min after utility recovery) and applications last (3min
after utility recovery).
4.3.3.2 Step 1: Installation setup
4.3.3.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).