Powering down/up applications (examples)
Servicing the Network Management Module – 163
4.3.1.3 Step 2: Agent settings
4.3.1.3.1 Objective
Ensure IT solution is shutdown gracefully.
4.3.1.3.2 Resulting setup
1. InstallIPPSoftware on each server (Application, Database servers, Storage) and register the UPS load segment as power source:
Applications:Group 1
Database servers:Group 2
Storage: Entire UPS
2. Pair agent to the Network Module (Pairing agent to the Network Module).
  When done, each server appears in the Agent list.
3.Navigate toContextual help>>>Protection>>>Agent shutdown sequencingpage.
4. Set the OS shutdown duration to the time needed for your server to shutdown gracefully.
  This will make sureIPPshutdowns your servers before the load segment is powered down.
  As a result, it will define the overall shutdown sequence duration for each load segments.
4.3.1.4 Step 3: Power outage policy settings
4.3.1.4.1 Objective
Use load segment policies to define shutdown sequencing.
4.3.1.4.2 Resulting setup
1. Navigate toContextual help>>>Protection>>>Shutdown on power outagepage of the Network Module
2. Make sure Primary is set to: Maximize availability.
For examples of Agent settings, see the Agent shutdown sequencing examples section.
For examples of Power outage policy, see the following sections:
Maximize availability policy example
Immediate graceful shutdown policy example
Load shedding policy examples
Custom policy examples