EasyManuals Logo

Ecolab Connexx red & blue User Manual

Ecolab Connexx red & blue
Go to English
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #84 background imageLoading...
Page #84 background image
6 Commissioning and operation
Personnel:
n
Manufacturer
n
Servicing personnel
n
Specialist
We recommend using water when commissioning in order to check all external
connections for leaks, and to adjust the air supply and the suction time.
The commissioning must be done as follows
1. Ensure voltage supply and compressed air
supply
Ä
Chapter 5.1 ‘Installation requirements’ on page 28.
2. Connect full container(s) with Click & Plug coupler or immerse hose end(s) in open
water tank.
CAUTION!
Never apply pressure on the lifting vessel while rinsing or filling with
water!
3. T
urn on the master switch, start the filling process ON LED lights up green / LL1 LED
(container 1) lights up green. Solenoid valve opens air supply to the injector
. The
lifting vessel is filled for 10 seconds
Ä
Chapter 4.5.4 ‘Adjusting elements’
on page 26 and
Ä
Chapter 4.5.5 ‘Timer period for pump enable and empty signal’
on page 27. If the level switch in the lifting vessel has already been reached, the next
step can be omitted. The Connexx control unit sends an enable signal to the
connected pumps.
During transport it may be possible that the mechanical floater for overfill
safety at the top stays firmly hanging and in spite of flowing
injector, no
product is sucked into the lifting vessel
Ä
Chapter 4.4 ‘Overfill protection’
on page 21.
Commissioning and operation
33 Rev. 1-06.2018

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ecolab Connexx red & blue and is the answer not in the manual?

Ecolab Connexx red & blue Specifications

General IconGeneral
BrandEcolab
ModelConnexx red & blue
CategoryWater System
LanguageEnglish