EasyManua.ls Logo

Epson G20 Series - Page 175

Epson G20 Series
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance 7. Arm #3
G10 / G20 Rev.20 163
(13)
When you use the plate of 4
-point mounting,
mount the
plate.
When you use the plate of 3
-point mounting,
mount the plate pressing it to the J
oint #4 motor
side.
When mounting the battery unit, be sure to keep
the connectors connected to the battery unit.
If connectors of the battery unity are
disconnected, y
ou need to perform calibration
again.
4-point mounting
4-M4×10
Plate
Battery unit
3-point mounting
Plate
Battery
unit
(14)
Re
-bundle the cables in their original positions with a wire tie
removed in the
removal procedure
. Do not allow unnecessary strain on the cables.
(15)
Install the arm
top cover and the arm bottom cover.
For details, refer to Maintenance: 3. Covers.
(16)
Perform the calibration of Joint #3.
For details, refer to Maintenance: 14. Calibration.

Table of Contents

Related product manuals