EasyManua.ls Logo

Filtec FT-50c - Page 56

Default Icon
239 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3: Installing the FT-50
3-17
7. Mark the positions of the mounting holes and then anchor each
bracket with two 1/2 inch x 4 inch lag bolts and lead floor
inserts.
Figure 3-15. Anchoring the slant braces to the floor.
8. Firmly tighten all bolts and pipe clamps and then tack weld the
following points with an oxyacetylene welder. Remember to
remove the pipe clamps when you finish.
Industrial Dynamics Company, Ltd. Document 40255-0600

Table of Contents