EasyManua.ls Logo

Filtec FT-50c - Before You Begin

Default Icon
239 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4: Configuring the FT-50 for Operation
4-5
Before You Begin
Before you begin configuring the FT-50, verify the following is
completed:
The inspection head is completely installed and is correctly
centered and leveled over conveyor chain as explained in
Chapter 3: Installing the FT-50.
The rejector is completely installed and is aligned correctly
with the conveyor chain as explained in the rejector manual.
The takeaway conveyor is configured properly as explained in
the rejector manual.
All ramp actions position the containers properly on the
conveyor chain when they reach the inspection area.
Containers ride smoothly on the conveyor, do not slide, and
are not agitated when they reach the inspection area.
The rejector air pressure is stable and set at the correct
pressure.
All power cable wiring to the FT-50 and signal cable wiring to
the rejector, encoder, and any remote sensors are complete.
The Safety Interlock Switch is turned on. This switch must be
on in order to activate the Gamma Generator.
Industrial Dynamics Company, Ltd. Document 40255-0600

Table of Contents